Planning: load levels, scenarios, compare and batch

A planning study is "this feeder, at this load condition, base against alternative". These are the three nouns, and this page is how the app spells them.

Load levels

Every solve used to run every load at its rated kW. A load level is a named load condition: a multiplier on every load (OpenDSS's set loadmult), optional multipliers by load class on top, and which rating loading is judged against.

Define them in File → Project properties → Load levels. Use the usual three gives:

Level Multiplier Rating Used for
Peak 1.0 normal Capacity and voltage drop, what every circuit solved before
Minimum daytime 0.3 normal Overvoltage and reverse power with DER on the feeder; the case a hosting-capacity study binds on
Emergency peak 1.0 emergency N-1 and transfer cases, where the emergency rating is what is allowed for a few hours

Pick the level for the next solve under Analysis → Load level, in the Scenarios tab, or in the toolbar, where a Rated dropdown appears once a project has levels and the window is wide enough for it. The status line, the hover tooltips and the study report's title block all name it, and a comparison can tell two levels apart.

Class multipliers scale one class of load on top of the global multiplier. Give loads a Class in the properties panel (any word: residential, commercial, a rate code) and type residential=1.5 in the level's class column; that class's kW is multiplied by 1.5 before the global factor applies. This is how an "EV evening" level or a "commercial peak" level is written.

Emergency ratings. Lines, switches and protective devices carry an Emergency rating in amps (emergamps) and transformers and regulators one in kVA (emerghkva) beside their continuous rating; blank is OpenDSS's own default of 1.5 × the continuous rating. A level on the emergency rating judges loading, the loading overlay, the abnormal-condition report and the pies against that figure instead. Imported files keep the ratings they gave.

Scenarios

A scenario is an alternative to the base circuit: a regulator setting changed, a tie opened, a bank added, a unit taken out of service, a new DER. The project stores a scenario as deltas against the base — the parameters that differ, the elements added, the elements removed — so a project with ten alternatives is still one drawing, and the file always holds the base.

Work with them in the Scenarios tab (or Analysis → Scenario):

  • Add a scenario and it opens at once: from then on, every edit on the drawing belongs to that scenario, until you pick Base case again. The toolbar shows which scenario is open. Elements can be changed, added, wired, removed, opened or taken out of service — anything the editor does.
  • Switch between the base case and any scenario; the drawing swaps to that alternative. Positions are shared, so a symbol moved in one place is moved everywhere. Undo history does not cross a switch.
  • Duplicate a scenario to branch from it; delete one you are done with. A description field holds what the alternative is for.
  • A solve, fault study, time series or export runs on the open scenario; the result says which one.

On export to .dss the open scenario is what is written. A saved project (.json) keeps the base, every scenario and which one was open.

How the deltas are made

The app diffs the drawing against the base when you leave a scenario, element by element. The Python side (core/scenarios.py) applies the same deltas, so a batch run or a scripted study can rebuild any alternative from one saved document.

Compare

Pin solve as baseline (Scenarios tab, or Analysis) keeps the current solve as the "before". Then change the circuit, open another scenario or pick another load level, solve, and:

  • the Compare overlay draws the change at every bus (lowest phase voltage in pu, red lower, green higher) and on every series element (loading in points of per cent, red higher);
  • the Compare tab lists every bus and element whose result changed, largest change first, with the before, after and difference, and headline numbers: the change in losses, in the lowest voltage, in the highest loading, and the number of violations before and after;
  • the study report's Comparison section prints the same.

The baseline survives edits on purpose, since it is the "before"; unpin it from the Compare tab.

Batch

Run all in the Scenarios tab (or Analysis → Run every scenario at every load level) solves the base case and every scenario at every load level as a background job and tabulates each cell: source kW, lowest voltage and where, highest voltage, highest loading and on what, losses, and the counts of undervoltages, overvoltages, overloads and warnings. A row is tinted when a cell has a violation, red when it did not converge. The report's Scenarios and load levels section prints the matrix.

The run is a job: it reports progress, can be cancelled, and its result stays on the server for a while (GET /api/jobs), so a tab that lost its connection can read it back. On the hosted service a plan caps how many solves one job may take; locally there is no cap.

Controls that come with this

Two control classes a real feeder carries could only ride along as passthrough text before. Both are now settings on the element they control, written and read back on import and export.

Capacitor controls (CapControl): on the capacitor, Control picks the type — voltage (switch on below, off above, in volts on the PT secondary), current or kvar (on above, off below, through the element it watches), pf, or time of day — and Watches names the line, transformer or switch the control measures (or the capacitor's own terminal). PT and CT ratios, on and off delays and the dead time are the engine's properties under their own names.

Smart inverter functions (InvControl): on a PV system or storage unit, Inverter function picks volt-var, volt-watt, both, watt-pf or watt-var, each pointing at an inverter curve from the Curves tab (per-unit voltage against per-unit power, negative var absorbing). The Curves tab adds the IEEE 1547-2018 Category A and B defaults in one click. Units sharing a function and curve are grouped into one control, as the engine wants.

Regulators gain reverse-power mode (reversible, with its own setpoint and bandwidth) and cogeneration mode (cogen), which decide what the control does when a closed tie or exporting DER pushes power backwards through it.

Control operations. Every time-series run now counts tap changes per regulator and switching operations per capacitor bank, step to step. The summary above the time graph lists them, and totals.controlOps in the result is the per-step series. This is a hosting-capacity criterion and the measure of a Volt/VAR scheme's wear on its equipment.